Action
Selected for the "FY2025 Subsidy Project for Supporting the Introduction of Grid-scale Storage Batteries and Water Electrolyzers"
We are pleased to announce that our joint project with Japan Energy General System Co., Ltd. to introduce storage batteries was approved. Aiming to start operations in 2027, we will promote the efficient use of local renewable energy.
Conclusion of Sales Agency Agreement with NPAT Co., Ltd.
Partnering with N-PAT, a leader in innovative off-site solutions, RYODEN leverages its extensive network to boost productivity in the construction and facility sectors, addressing critical labor shortages.
Joined the "eR Network®" established by Mitsui-Chemours Fluoroproducts Co., Ltd.
We are evolving refrigerant recovery from destruction to reclamation. By combining low-GWP equipment with our recycling scheme, we create sustainable environments and drive carbon neutrality.
Conclusion of Agency Agreement with CoolAutomation Japan G.K.
Providing solutions that integrate different communication specifications across manufacturers, enabling centralized management of air conditioning equipment. By achieving optimal control of air conditioning, which accounts for a large portion of building energy consumption, we support initiatives toward carbon neutrality.
Constructed an ISO Class 1 Super Clean Room for "KamLAND" at Tohoku University's Research Center for Neutrino Science
Our in-house designed, "ISO Class 1" super cleanroom at Tohoku University stands as a globally unique facility integrated with a particle observation site. We support the front lines of cutting-edge research from the ground up, driving the future of particle physics in Japan.